Search scope:
排序: Display mode:
Application of fuzzy analytic hierarchy process model on determination of optimized pile-type
Lei MA, Shuilong SHEN, Jinhui ZHANG, Yang HUANG, Feng SHI
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 2, Pages 252-257 doi: 10.1007/s11709-010-0017-2
Keywords: pile type fuzzy synthetic evaluation analytic hierarchy process (AHP) optimal selection
Analytic Method to a Kind of Grey Fuzzy Decision Making Based on Entropy
Luo Dang,Liu Siwei
Strategic Study of CAE 2004, Volume 6, Issue 10, Pages 48-51
Based on grey system theory and fuzzy theory, uncertain decision making problems and several relativearticles were studied, then points out the advantage and shortage of them when dealing with grey fuzzymaximum entropy formulism, a method for multi-attribute group decision making based on the theory of grey fuzzy
Keywords: grey fuzzy relation entropy multi-attribute decision making
Lizzette Pérez LESPIER, Suzanna LONG, Tom SHOBERG, Steven CORNS
Frontiers of Engineering Management 2019, Volume 6, Issue 3, Pages 368-383 doi: 10.1007/s42524-019-0004-9
Keywords: Environmental sustainability maritime transportation system environmental impact indicators fuzzy analytichierarchy process fuzzy TOPSIS decision-making tool
Detection of schedule delay risk of empirical construction projects
Tsegay GEBREHIWET, Hanbin LUO
Frontiers of Engineering Management 2018, Volume 5, Issue 2, Pages 251-267 doi: 10.15302/J-FEM-2018086
Keywords: fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk
Practical evaluation for water utilities in China by using analytic hierarchy process
Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG
Frontiers of Environmental Science & Engineering 2015, Volume 9, Issue 1, Pages 131-137 doi: 10.1007/s11783-014-0718-1
Keywords: analytic hierarchy process (AHP) risk management water quality failure water quantity failure
Shuangxi FENG, Huayang LEI, Yongfeng WAN, Haiyan JIN, Jun HAN
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 2, Pages 461-477 doi: 10.1007/s11709-021-0705-0
Keywords: deep foundation pit excavation adjacent bridge foundation influencing factors analytic hierarchy process
Li Da,Hong Kairong and Tan Zhongsheng
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 95-100
Keywords: Bohai Strait tunnel analytic hierarchy process fuzzy evaluation risk estimation risk countermeasure
AFHW Approach to Virtual Enterprise Agility Measurement
Wang Shuo,Tang Xiaowo
Strategic Study of CAE 2002, Volume 4, Issue 7, Pages 29-32
Keywords: virtual enterprise agility measurement AFHW model analytic hierarchy process(AHP) fuzzy and gray and
SHM-based F-AHP bridge rating system with application to Tsing Ma Bridge
Qi LI, You-lin XU, Yue ZHENG, An-xin GUO, Kai-yuen WONG, Yong XIA
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 4, Pages 465-478 doi: 10.1007/s11709-011-0135-5
Keywords: structural health monitoring (SHM) bridge rating method fuzzy based analytic hierarchy approach criticality
Incomplete Fuzzy Information System
Yang Xibei,Yang Jingyu,Wu Chen,Fu Fan
Strategic Study of CAE 2006, Volume 8, Issue 7, Pages 47-53
In this paper, incomplete fuzzy information system is studied.In order to deal with it by rough set theory, fuzzy compatible relation and fuzzy rough approximationFurthermore, fuzzy covering on universe is proposed, three different operations on the coverings areincomplete fuzzy information system.A new method for measuring the strength of partial fuzzy knowledge dependency is proposed.
Keywords: incomplete fuzzy information system fuzzy compatible relation fuzzy rough set fuzzy covering fuzzy roughentropy fuzzy knowledge dependency
An overview on the applications of the hesitant fuzzy sets in group decision-making: Theory, support
Zeshui XU, Shen ZHANG
Frontiers of Engineering Management 2019, Volume 6, Issue 2, Pages 163-182 doi: 10.1007/s42524-019-0017-4
Keywords: hesitant fuzzy set hesitant fuzzy preference relation group decision-making
A Sort of Continued Fuzzy Operators and Its Application
Zhang Shiqiang
Strategic Study of CAE 2003, Volume 5, Issue 9, Pages 27-31
A sort of continued fuzzy operators is given.from applied point of view, relation between the triangle norm operators most in use and the continued fuzzyA new fuzzy synthetic evaluation criterion and method are given.The new fuzzy synthetic evaluation criterion and method have some important characteristics as follows
Keywords: fuzzy mathematics fuzzy synthetic evaluation triangle norm operator continued fuzzy operators
A novel approach for remanufacturing process planning considering uncertain and fuzzy information
Frontiers of Mechanical Engineering 2021, Volume 16, Issue 3, Pages 546-558 doi: 10.1007/s11465-021-0639-1
Keywords: remanufacturing uncertain and fuzzy information process planning T-S FNN
Model of Fuzzy Geometric Programming in Economical Power Supply Radius and Optimum Seeking Method
Cao Bingyuan
Strategic Study of CAE 2001, Volume 3, Issue 3, Pages 52-55
Keywords: fuzzy geometric programming economic power supply radius optimum seeking transformer substations capacity
Manoj Kumar PANDA, Gopinath PILLAI, Vijay KUMAR
Frontiers in Energy 2013, Volume 7, Issue 3, Pages 307-316 doi: 10.1007/s11708-013-0269-3
Keywords: power system oscillations thyristor controlled series capacitor (TCSC) type-2 fuzzy logic system intervaltype-2 fuzzy logic controller (IT2FLC)
Title Author Date Type Operation
Application of fuzzy analytic hierarchy process model on determination of optimized pile-type
Lei MA, Shuilong SHEN, Jinhui ZHANG, Yang HUANG, Feng SHI
Journal Article
Analytic Method to a Kind of Grey Fuzzy Decision Making Based on Entropy
Luo Dang,Liu Siwei
Journal Article
A model for the evaluation of environmental impact indicators for a sustainable maritime transportation systems
Lizzette Pérez LESPIER, Suzanna LONG, Tom SHOBERG, Steven CORNS
Journal Article
Detection of schedule delay risk of empirical construction projects
Tsegay GEBREHIWET, Hanbin LUO
Journal Article
Practical evaluation for water utilities in China by using analytic hierarchy process
Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG
Journal Article
Influencing factors and control measures of excavation on adjacent bridge foundation based on analytic
Shuangxi FENG, Huayang LEI, Yongfeng WAN, Haiyan JIN, Jun HAN
Journal Article
Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel
Li Da,Hong Kairong and Tan Zhongsheng
Journal Article
SHM-based F-AHP bridge rating system with application to Tsing Ma Bridge
Qi LI, You-lin XU, Yue ZHENG, An-xin GUO, Kai-yuen WONG, Yong XIA
Journal Article
An overview on the applications of the hesitant fuzzy sets in group decision-making: Theory, support
Zeshui XU, Shen ZHANG
Journal Article
A novel approach for remanufacturing process planning considering uncertain and fuzzy information
Journal Article
Model of Fuzzy Geometric Programming in Economical Power Supply Radius and Optimum Seeking Method
Cao Bingyuan
Journal Article